Paddington Station
Morgan Sindall are carrying out an internal joint venture which covers the replacement of the existing roof structure and glazing over an operational main line station. This requires extensive protection measures for both the public and trains involving the erection of major temporary work structures and protective decks. These works are being undertaken during full track Possessions and engineering hours which we are managing
There are widespread structural steelwork repairs, grit blasting and redecoration. Externally, in preparation for Crossrail there are major external works with waterproofing of a large suspended car park deck over live rail tracks. Platform reconstruction works with drainage renewals and new limestone paving.